Road and bridge construction must see | flexible operation, safe operation, less land occupation of the new high-speed rail tanker hoist
Release time:
2022-02-09
An important part of road and bridge construction is the cement pouring of bridge deck. The tank car with cement concrete needs to be raised to the bridge deck that needs to be poured. There are two common ways to water the bridge deck. One is to use the gantry crane to lift the cement tanker to the bridge deck. The other is to set up a tanker lifting frame around the bridge to lift the tanker to a predetermined height and then pour the cement concrete.
However, these two ways have their own disadvantages. A gantry crane is used to lift the cement tanker, because the center of gravity of the cement tanker is not in the middle of the vehicle,It is very prone to deflection during lifting, causing the cement in the tanker to spill and injury. The tanker lifting frame is used to lift the tanker to the specified height through the hoist. Most of the common winches are long-distance erection, which has certain requirements on the construction environment and floor area, resulting in construction inconvenience, and concrete construction is prone to dust phenomenon, which will affect the sensitivity of the limit device, cause failure, and lead to safety accidents for operators.
In view of this situation, Tieshan Crane has developed a new type of high-speed rail tanker hoist to lift the cement tanker and heavy machinery to the bridge deck operation, which not only effectively eliminates the safety threat caused by equipment or environmental factors in the construction, but also reduces the construction cost and improves the construction efficiency.
The four characteristics of the new high-speed rail tanker hoist:
1. The operation is sensitive and convenient.When lifting the weight to the specified height, the limit device is not easily affected by the external environment, and the operation is sensitive and convenient; a plurality of fixing devices are set inside to ensure that the process of lifting the tanker stably rises to the specified height.
2. High safety factor and stable operation.It is equipped with a shock-absorbing structure to reduce the jitter generated during the lifting process and run smoothly; a fixed card slot is set between the lift platform and the tanker to prevent the tanker from sliding during the lifting process and cause accidents, which is more secure and safe.
3. Small footprint.The adjustment of the internal structure is not only stable and reliable, but also reduces the overall floor space of the hoist.
4, easy to transport heavy machinery to the bridge deck, improve the efficiency of road and bridge construction.The improved and upgraded high-speed rail tanker hoist has stronger force performance and can transport cement tankers or other heavy machinery.
The high-speed rail tanker hoist lifted by Tieshan facilitates the important link of bridge pouring and improves the efficiency of road and bridge construction. If in the road and bridge construction, the need for cement concrete mixer/Tanker or other machinery lifting to the bridge deck operation, small editor recommended Tieshan lifting high-speed rail tanker hoist.