+
  • 双梁桥式起重机(1712578352491).jpg

Double girder bridge crane


Category:

Bridge Crane


Structure: It consists of two parallel main girders, matched with the big trolley running mechanism, lifting trolley and electrical system, with strong stability.
Principle: the big car moves longitudinally along the rail, the trolley runs transversely between the two main girders, and the hoisting mechanism realizes the lifting and lowering of heavy loads through the wire rope and hook.
Features: large lifting capacity (up to hundreds of tons), long span, wide operating range; double beam design disperses the load, suitable for lifting heavy and large objects; smooth operation, high safety.
Application: Widely used in machinery manufacturing, metallurgy, ports and other fields to undertake the loading and unloading of steel, large equipment and other heavy objects, handling and installation operations.


Key words:

Previous:

Next :

Message


Related Products